logo
Nhà Các trường hợp

Q355 Steel Space Frames airport terminal building for large span building

Chứng nhận
Trung Quốc Herbert (Suzhou) International Trade Co., Ltd Chứng chỉ
Trung Quốc Herbert (Suzhou) International Trade Co., Ltd Chứng chỉ
Tôi trò chuyện trực tuyến bây giờ

Q355 Steel Space Frames airport terminal building for large span building

January 10, 2024
trường hợp công ty mới nhất về Q355 Steel Space Frames airport terminal building for large span building

if you want a space frame structure,contact me whatsapp:+86 18510932293

Executive Summary

 

Uzbekistan Market Analysis

 

  • Construction Boom: Uzbekistan's infrastructure development is accelerating, with special emphasis on modern commercial spaces and sports facilities
  • Import Dependency: 80% of specialized construction materials are imported, creating opportunities for foreign expertise
  • Key Projects: Tashkent City development, New Uzbekistan Stadium, and regional shopping mall constructions

 

  • Climate Considerations: Extreme temperatures (-20°C to 45°C) demand durable materials
  • Seismic Factors: Uzbekistan is in seismic zone 5-6, requiring earthquake-resistant designs
  • Architectural Trends: Growing preference for innovative, light-admitting structures in commercial spaces

1. Engineering Expertise

  • 2. Manufacturing Capabilities
    • 3. Project Portfolio
      • Target Client Profile

         

        • Developers of premium shopping malls in Tashkent, Samarkand
        • Government-backed sports facility projects
        • International architectural firms working in Central Asia

         

        • Regional contractors specializing in steel structures
        • University reconstruction projects
        • Transportation hub developments

        Phase 1: Market Penetration (Months 1-6)

        • Phase 2: Brand Building (Months 6-12)
          • Phase 3: Project Acquisition (Ongoing)
            • Proposed Pilot Project: "Samarkand Mall Skylight"

               

              • 2,800㎡ free-form skylight with integrated solar shading
              • Local material utilization (30% Uzbek steel)
              • 6-month installation timeline with our supervision team

               

              • 18% lighter structure than conventional alternatives
              • BIM coordination with local architects
              • Weather-responsive design for Uzbekistan's climate

              Pricing Strategy:

              • ROI Projections:
                • Risk Management

                   

                  • Currency fluctuation (hedging strategy in place)
                  • Local workforce training (our certified training programs)
                  • Logistics optimization (pre-assembled modules)

                   

                  • Letter of Credit payments only
                  • On-site quality control team deployment
                  • Strategic inventory in Kazakhstan for faster delivery

                  Herbert Suzhou International is uniquely positioned to become Uzbekistan's preferred partner for complex space frame structures. Our combination of engineering expertise, manufacturing control, and project experience in challenging environments makes us the ideal choice for developers seeking innovative skylight solutions. 

Chi tiết liên lạc
Herbert (Suzhou) International Trade Co., Ltd

Người liên hệ: Ms. Meng

Tel: +86 13852031905

Gửi yêu cầu thông tin của bạn trực tiếp cho chúng tôi (0 / 3000)