logo
Nhà Các trường hợp

Libya shopping mall skylight

Chứng nhận
Trung Quốc Herbert (Suzhou) International Trade Co., Ltd Chứng chỉ
Trung Quốc Herbert (Suzhou) International Trade Co., Ltd Chứng chỉ
Tôi trò chuyện trực tuyến bây giờ

Libya shopping mall skylight

December 5, 2023
trường hợp công ty mới nhất về Libya shopping mall skylight

Case Study: PC Sheet Skylight Roof Project – Benghazi, Libya
Project Overview

  • Location: Shopping Mall in Benghazi, Libya
  • Scope: 2,600 m² skylight roof using 12mm thick polycarbonate (PC) sheets
  • Structure: Custom steel framework designed and supplied by [Your Company Name]
  • Key Features: High light transmission, UV resistance, and structural durability tailored to Libya’s climate.
  •  

A. Climate Adaptability

  • Extreme Weather Resilience: Libya’s arid climate (high temperatures, sandstorms, and occasional heavy rains) demands materials with:
    • Thermal Stability: PC sheets offer low thermal expansion (coefficient ~0.065 mm/m°C), reducing stress on joints.
    • UV Protection: 12mm multi-wall PC sheets block 99% of UV rays while maintaining 80%+ light transmission.
    • Sandstorm Resistance: Smooth surface minimizes sand accumulation; steel framework ensures wind load compliance (up to 120 km/h).

B. Economic & Regulatory Advantages

  • Local Demand: Libya’s post-conflict reconstruction drives demand for cost-effective, durable roofing solutions.
  • Material Availability: PC sheets are lightweight (1.2 g/cm³), reducing shipping/logistics costs versus glass alternatives.

2. Technical Highlights

A. Steel Structure Design

  • Material: Hot-dip galvanized steel (ASTM A123) for corrosion resistance in coastal Benghazi.
  • Load Calculations: Optimized truss spacing (1.5m) to support PC sheets under 1.5 kN/m² live loads.

B. PC Sheet Integration

  • Sealing System: Silicone gaskets and aluminum profiles prevent dust/water ingress.
  • Maintenance: Easy-to-replace modular panels reduce long-term costs.

3. Competitive Edge for Your Business

  • Localized Solutions: Highlight past projects in MENA region (e.g., Egypt, UAE) to build trust.
  • Sustainability: PC sheets are 100% recyclable—appealing to eco-conscious developers.
  • Cost Efficiency: 30% faster installation vs. glass, reducing labor expenses.

4. Visuals & Data (Suggested for Presentation)

  • Before/After Images: Showcase the mall’s transformation.
  • Climate Data Graph: Compare temperature/sandstorm frequency vs. PC sheet performance.
  • Client Testimonial: “The skylight reduced cooling costs by 15% due to superior insulation.”

 

Chi tiết liên lạc
Herbert (Suzhou) International Trade Co., Ltd

Người liên hệ: Ms. Meng

Tel: +86 13852031905

Gửi yêu cầu thông tin của bạn trực tiếp cho chúng tôi (0 / 3000)